Set-up Reduction -
Increase flexibility, reduce setup times and improve production flow.
Setup Reduction builds on the principles of the Single Minute Exchange of Dies (SMED) system, developed by Shigeo Shingo, to dramatically reduce or eliminate changeover time. Meet customer demands for high-quality, low-cost products, delivered quickly and without the expense of excess inventory. |
| |
- Respond to customer needs and schedules with more flexibility
- Improve on-time
- Decrease costs due to excess inventory
|
- Increase line and machine capacity levels
- Increase changeover accuracy
- Reduce startup defects
|
Standard Work -
Employ the foundation of continuous improvement and sustainability.
Standard work is one of the most powerful but least used lean tools. It adds discipline and accountability to the culture, elements that are frequently neglected but essential for lean to take root. Standard work is also a learning tool that supports sustainability, promotes problem solving and team work. Standard work is the key component to a company's success, which is satisfying the customer.
|
| |
- Reduction in variability
- Reduction of injuries and strain
- Reduced training time
|
- Creates baseline for Continuous Improvement
- Increase production
|